Rent a load bank and test your own equipment.
Do you wish to test your existing emergency power systems? We rent our load banks with a performance from 10 to 900 KW. With the help of a load bank you can determine whether your power supply system is capable of delivering the appropriate target power as necessary.
Your benefits by using one of our load banks
Our load banks ensure the viability and resilience of your systems. Likewise, they can be used for adjusting, testing and maintaining as well as the technical inspection of your generators. For this purpose, load tests are carried out with continous operation, load connnection and load disconnection.
- Load banks from 10-900 KW
- Short term planning (Enquiry)
- Fast delivery by our trucks
- Own pickup with training is possible
- Rapid availability, for example as 900 KW with two axle trailer, 2,6 tons total weight
Our load banks are suitable for
- iDiesel generators
- Standard heating installation
- 3-phase alternating current
- Test according DIN 6280-13
- Gas, fuel oil and steam turbine
- Room and thermal load for climate test
- Combined cycle
- Standard generator calefaction test
- Uninterrupted power supply unit
- Transfer and elemination from Load
- Transformer Load dispersion
- Frequency converter
- Simulation from e-motor start
- Engines
- Provision of baseloadn
- Alternating current generators
- Battery discharge
- Emergency power generators
- Testing of UPS constructions
- Gearsystem and Subsystem
- Indoor heating for temperature simulations
- Gas and steam turbine
- Examination of distribution
- Implementing test
- Transformers temperature test
- Electric test runs
- DC aggregates test
- Total power from wind energy appendix
- Test from frequency inverters
Lastbänke 200 KW bis 900 KW
Lastbank → Load resistance 200 KW
200 kW load bank | Verifiable load up to 200 kW (ohmic load at 400 volts)
For the required recurring maintenance or during the commissioning of backup power systems, load banks are needed and used to perform load tests. These load tests are mostly used with rented load banks to ensure the performance of power supply systems.
Our load banks are operated ohmically. By connecting individual load banks in parallel, we can offer you higher total capacities.
Our 200 kW load banks can be rented in 3 different load stages, and the load can be increased in the following load stages:
- Lastbank 200 KW = 40 KW 40 KW 40 KW 40 KW 40 KW
- Lastbank 200 KW = 10 KW 20 KW 20 KW 50 KW 100 KW
- Lastbank 200 KW = 10 KW 20 KW 20 KW 50 KW 100 KW
- Connection possibility = via a busbar in the terminal box
- Dimensions = Length: 1,500 mm overall
- Width = 1,200 mm overall
- Height = 1,900 mm overall
- Weight = approx. 500 kg on castors
Lastbank → Load resistance 300 KW
300 kW load bank | Testable load up to 300 kW (resistive load 400 volts)
The 300 kW load bank can be rented in 1 load stage; the load can be connected in the following load stages:
- Load bank 300 kW = 100 kW + 100 kW + 100 kW
- Connection option = Via a busbar in the terminal box
- Dimensions = Length: 1,200 mm overall
- Width = 900 mm overall
- Height = 1,790 mm overall
- Weight = approx. 500 kg on castors
- Manual = PDF download »
Lastbank → Load resistance 700 KW
Our mobile load bank 700 KW. Flexible use for your emergency power system, emergency power supply or UPS systems up to 0,7 MW.
For on-site operations, we will provide you with a mobile load bank
WA Notstromtechnik GmbH has several mobile load banks for full load testing of generator systems with a capacity of up to 2,5 MW. These systems can be used to examine and test load banks from all manufacturers.
In many cases, generator systems or UPS systems can not be operated with their nominal load or be loaded with a load at all. This applies, for example, to rented emergency power plants and large-scale server stations. However, load tests with full utilization are stipulated by law (VDE 0100 part 710 in conjunction with DIN 6280 part 13) and must be carried out and recorded at regular intervals in order to ensure the functionality of the system in an emergency.
At this point, we can recommend the mobile version of our 700 KW load bank. With this one, our customers have the opportunity to test their emergency power supply on-site with very little effort. The load resistance is gradually loaded according to the manufacturer’s specifications to 100% of its emergency power system or UPS system. After the test run, you will receive a test report in which the actual performance of the system is documented. The system is thus proven to be tested, ready for use and safe. For emergency power systems, proof of the 110% load can be provided.
Our mobile load bank, also called “dummy load”, is used for:
- generators, which are operated seldom or only lightly loaded
- emergency power supply without load function
- troubleshooting and commissioning of gensets
The 700 KW load bank can be rented in 1 load level. The load is connectable in following load level:
1 » Load bank 700 KW = 1 KW to 700 KW (in 1 KW steps)
- Total power: Testable load 700 KW (resistive load 400 Volt)
- Connectivity: About a busbar in the terminal box
- Length: 1.600 mm over all
- Width: 1.000 mm over all
- Height: 1.600 mm over all
- Weight: ca. 750 kg
- Handbook: PDF-Download »
Lastbank → Load resistance 900 KW
900 KW Load Bank | Total power, verifiable load 900 KW (Resistive load 400 Volt)
Our mobile 900 KW load bank is the largest load bank to be rented in our range for testing emergency power packs and UPS systems.
This load bank can be loaded in the following load stages:
1 » Load bank 900 KW = 10 KW + 20 KW + 20 KW + 50 KW + 100 KW + 100 KW + 200 KW + 200 KW + 200 KW
- Execution: 2 axle trailer
- Connectivity: via a busbar in the terminal box
- Length: 5.240 mm over all
- Width: 1.860 mm over all
- Height: 2.280 mm over all
- Weight: ca. 2.600 kg
- Handbook: PDF-Download »






